Final Design Sketches

During the Easter break I also completed my last 3 final design sketches in relation to my feedback from the formative assessment before the holidays. I came up with a basic concept for raising all the seats in a single carriage by a hydraulics system in the walls of the train. So the operator would now only have to push a button to raise and lower the seat, then would have to lift or drop the backs into place along with folding out the base support. This does still involve manual work but doesn’t require much effort, especially compared to having to lift the complete seat upwards. As part of my design I wanted to make the carriage more organised so included a new seating plan and graphics design for the station floor.

img031img030

img032

Advertisements


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s